South Coast Customs & Classics Ltd
Floor pan refurbishment
Floor pan refurbishment
full floor pan refurbishment
new floor pan halves (heavy duty)
new fuel pipe front to rear (can upgrade to larger bore)
Floor pan will be blasted, zinc primed and powder coated to your choice of colour
(approx 2 week turn around)
Front Air Ride ball joint beam
Front Air Ride ball joint beam
Complete Front air ride kit
Everything you need to slam the front of your beetle/ karmann ghia/ Type 3 on the floor
Whats included:
Pair of air shocks will give 7 inches of adjustment
5 gallon air tank and single compressor
wiring harness with fuses/ relays
10m 6mm air hose
all air fittings
dual needle air gauge
single paddle valve
full set of long travel ball joints
through rods
polybush beam kit
fitting kit
Full instructions
Front Air Ride king + link pin beam
Front Air Ride king + link pin beam
Complete Front air ride kit
Everything you need to slam the front of your beetle on the floor
Whats included:
Pair of air shocks will give 7 inches of adjustment
5 gallon air tank and single compressor
wiring harness with fuses/ relays
10m 6mm air hose
all air fittings
dual needle air gauge
single paddle valve
through rods
polybush beam kit
fitting kit
Full instructions
Engine service
Engine service
Engine service, to include oil change and flush, new oil strainer and gaskets, new spark plugs, new rocker cover gaskets, full engine tune and health check
From..
Engine building service
Engine building service
Call us today to discuss options
from rebuilding your tired 1200 to a full blown 2332 turbo monster